Installation information
Important Information for Exhibitors
Exhibition Architecture:
The museum has a dedicated team of architects who will prepare the exhibition architecture, including all plinths (pedestals) and basic structural solutions required to display your artwork.
You do not need to transport or build your own plinths or display structures,
unless your artwork has highly specific, custom, or unusual structural requirements (e.g., a unique hanging apparatus, specialized framework, or custom suspension).
On-Site Support:
A professional museum team will be on-site to assist you with the installation process.
Remote Installation:
If you are shipping your work and cannot be present, our museum team will securely receive your shipment and fully install the artwork on your behalf according to your provided instructions.
arrow_drop_down_circle
Divider Text
Key Dates to Remember
November 13th – 19th, 2026:
Delivery window for shipped artworks (exact shipping address TBA).
Applicable only if you are not delivering and installing your work in person.
November 23rd – 27th, 2026:
In-person delivery and on-site exhibition installation at the Museum of Prague
November 28th:
Installation final touches
February 1st, 2027:
Exhibition deinstallation.
arrow_drop_down_circle
Divider Text
Installation form
To ensure a smooth installation process for the upcoming exhibition, please complete this form regarding the delivery and technical requirements of your artwork.
arrow_drop_down_circle
Divider Text
Artwork & Finalist Information
Name
Email
settings
Name of Artwork
settings
Phone number (where can we reach you in urgent situations or installation questions?)
arrow_drop_down_circle
Divider Text
Delivery of Artwork & Installation
settings
Select...
I WILL BRING IT BY MYSELF
I WILL SHIP IT
How will you deliver your artwork?
settings
Select...
NO
YES
Will you be present for the installation of your artwork (Nov 23–28)?
settings
Select...
25. 11. 2026 10:00-16:00
26. 11. 2026 10:00 - 16:00
27. 11. 2026 10:00 - 16:00
Confirm date of installation (if you will install by yourself):
settings
Optimal area for my artwork (cm x cm)
upload
close
download
Browse
Installation Instructions (File Upload): If the museum team is installing your work, or if you have a complex setup, please provide a link or upload a document/diagram with detailed instructions.
settings
Installation Comments, Requirements, or Text Instructions: If you did not upload a file above, please provide your step-by-step installation instructions here. You may also use this space to describe your installation process or leave any additional comments/requirements for the museum team.
arrow_drop_down_circle
Divider Text
Equipment & Technical Requirements
settings
Select...
I am bringing all necessary tools and equipment myself.
No tools are required (the piece is ready to place on the provided plinth).
I will be present, but I need to borrow standard tools from the museum (e.g., hammer, drill, measuring tape, level).
I require specialized equipment, custom structures, or specific technical support (e.g., specific rigging/hanging apparatus, ladder, AV equipment, specialized lighting, power outlets).
How will the installation equipment and tools be handled?
settings
Please list the exact tools, hardware, custom structures, or technical equipment you need the museum to provide
settings
Car plate number for access permission to venue:
arrow_drop_down_circle
Divider Text
Deinstallation
settings
Select...
I will pick it up in person.
A representative or gallery will pick it up on my behalf.
I need the museum team to pack and ship the artwork back to me.
How will your artwork be handled after the exhibition is deinstalled?
arrow_drop_down_circle
Divider Text
settings
I agree with the terms and conditions
settings
Submit
[bot_catcher]